Box 66, 2003-2009, undated
Scope and Contents
American/American Indian – Asbestos Abatement, 2007-2008;
American/American Indian – Bathrooms, 2007;
American/American Indian – BNIM, 2004-2009;
American/American Indian – Building Permit Submittals, 2007;
American/American Indian – Case Mock-Up, 2007;
American/American Indian – Casework, 2007;
American/American Indian – Goppion (Casework), undated;
American/American Indian – Columns, 2008;
American/American Indian – Commercial Openings, Inc. (Locks), undated;
American/American Indian – Commissioning, undated;
American/American Indian – Construction Management Resources, 2006;
American/American Indian – Cost Estimates, 2004-2007;
American/American Indian – Design Development, 2004-2007;
American/American Indian – Electrical, 2003-2008;
American/American Indian – Electrical Contractor, 2007;
American/American Indian – Fellert Ceiling, 2008;
American/American Indian – Fire Incidents/Burn Permit, 2008;
American/American Indian – Flooring, 2005-2007;
American/American Indian – Flooring Mock-Up, 2008;
American/American Indian – Galleries 211 and 223, 2003-2008;
American/American Indian – General Information, undated;
American/American Indian – George Sexton Assoc., 2004-2005;
American/American Indian – Gifts, 2004-2006;
American/American Indian – Hooper Room, 2004-2008;
American/American Indian – Kirkwood Hall Skylight, 2008;
American/American Indian – Lacy and Company re J.E. Dunn, 2005;
American/American Indian – Laylite Ceiling, 2003;
American/American Indian – Light Fixtures, 2007-2008;
American/American Indian – McCownGordon, 2007-2009;
American/American Indian – MEP, 2005-2008;
American/American Indian – P1 Group, Inc. (MEP), undated;
American/American Indian – Paint Colors, 2008;
American/American Indian – Patent Construction (Scaffolding), undated;
American/American Indian – Program Area, 2004-2007;
American/American Indian – Lacy and Co. Project Cost Summary, undated;
American/American Indian – Project Team, undated;
American/American Indian – Punch List, 2008-2009;
American/American Indian – Schedule, 2004-2009;
American/American Indian – Security System, 2008;
American/American Indian – Site Access, 2007;
American/American Indian – Slab, 2007-2008;
American/American Indian – Southwest Mezzanine, 2008;
American/American Indian – Special Inspections Reports, 2008;
American/American Indian – Structural Loading, 2008;
American/American Indian – Structural Engineering Associates (Structural), undated;
American/American Indian – Subcontractor Bid List, 2007;
American/American Indian – Terracon (Vibration Monitoring), undated;
American/American Indian – Walls, 2007;
American/American Indian – Zahner (Metalwork), undated;
American/American Indian – Meeting Notes, undated
Dates
- Creation: 2003-2009, undated
Conditions on Access
Since this collection is unprocessed, requested records must be reviewed before they can be viewed by researchers; allow a minimum of one week for review.
Appointments are necessary for the use of manuscript and archival collections.
Extent
From the Record Group: 166.50 Linear Feet (In 65 record center cartons, 5 clamshell boxes, and 34 binders.)
Language of Materials
From the Record Group: English
Processing Information
Unprocessed
Repository Details
Part of the The Nelson-Atkins Museum of Art Archives Repository